Testing · Laboratory

The calculation assumed a behavior. Measure it.

Connections, members, assemblies, and materials — tested under controlled loading to the reference the standard defines, so the numbers your model uses are measured, not inherited.

Lab testing · orientation

Testing replaces assumed behavior with measured behavior.

Engineers don’t throw dice and hope for the best.

  1. Uncertainty: Engineers don’t design with dice. Until connection behavior is measured, the model has to assume it: rigid, pinned, or somewhere between.
  2. Physical testing: A connection specimen is loaded back and forth in a laboratory test rig.
  3. Measured behavior: Its measured response replaces the range of assumed responses.
  4. Engineering knowledge: Backbone behavior and connection stiffness are derived from the measured response.
  5. Design input: Testing turns physical behavior into engineering knowledge. Measured behavior becomes a defensible design input.

Conceptual illustration. Engineering inputs shown are illustrative, not test data.

Why lab testing

What does lab testing add that calculation cannot?

Answer

Calculations rest on assumed stiffness, capacity, restraint, and material behavior. Laboratory testing measures those quantities on the finished product — including the effects of perforations, cold work, fabrication, and connection detail that analysis approximates. Raw test data is only the beginning: the value increases when results are converted into defensible engineering inputs.

The SMHE Lab test floor in Covina, California: reaction frames, portal load frame, hydraulic equipment, and specimen staging areas
The SMHE Lab test floor · Covina, California

Connection behavior

Connection behavior

Stiffness, strength, and cyclic response of the joints that govern how rack systems actually behave.

Members & assemblies

Members & assemblies

What columns, beams, arms, shelves, and partial assemblies actually carry — measured, not assumed.

Bracing, stability & panels

Bracing, stability & panels

The lateral system: bracing connections, base plates, portal stability, decking, and shear panels.

Materials, impact & certification evidence

Materials, impact & certification evidence

Finished-part material properties, impact energy response, repair validation, and the evidence base for certification.

The program around the test

Engineering the path to evidence

A test result depends on what happens before the load is applied, and its usefulness depends on what is done with the measurements afterward. SMHE Lab undertakes the work on both sides of the test, as set out in the plan for each program.

The test itself is only one part of the service.

  1. Production material

    The production component, stock, or material you already have.

  2. Preparation & test planning

    We read the governing method against your part and define a practical specimen. Where appropriate, preparation and test-specific fabrication are done in-house.

  3. Testing

    Controlled loading to the reference the method defines.

  4. Results & supporting data

    Measurements are reduced to the values used for engineering evaluation, with supporting test data maintained for traceability.

  5. Usable, traceable evidence

    A report that traces each value to the specimen and setup that produced it.

Conceptual illustration · the scope for each program is set by project-specific review and set out in the plan

Before the test · In-house preparation

Built around the test

Some tests require more than instrumentation. SMHE maintains practical specimen-preparation and fabrication capabilities to turn production material into test-ready specimens where appropriate, reducing unnecessary handoffs between the customer’s production floor and the laboratory.

  • Wire EDM cutting through a stack of cold-formed steel sections in the SMHE Lab, with sparks at the wire

    Wire EDM

    Coupons from the part itself

    Reduced-section tensile specimens are cut from supplied production material, where precision is required.

    Photograph · Wire EDM cutting coupons from production sections · SMHE Lab

  • Cutting and end preparation

    Stub columns from production sections

    Column sections are cut to length and their ends prepared for even bearing.

  • Plates and test-specific components

    The setup a method calls for

    Plates, fixtures, and other components are made for the test, so the product can arrive as produced.

  • Gloved hands holding a welding gun at the arc on a steel tube in the SMHE shop, with sparks

    Welding

    No special assembly to build and ship

    Test-specific parts are welded to the specimen here, where appropriate.

    Photograph · Welding in the shop · SMHE Lab

Maintained to support testing · not offered as a separate fabrication service · used where appropriate, as agreed in the plan for each program

What a connected program removes

  • Special specimen fabrication
  • Engineering and shop coordination
  • Unnecessary material and freight
  • Dimensional and assembly errors
  • Handoffs between shops
  • Delays from incorrectly prepared specimens

Lower cost is the result, not the offer.

What preparation changes

Preparation changes only what the method requires. The product under evaluation stays as produced, and the method used is documented in the report.

Start a request

After the test · Results and evidence

Results and supporting data

Measurements are reduced to the values used for engineering evaluation, with supporting test data maintained for traceability. The plan defines the results, records, and supporting data provided for the project.

What you receive

What you receive

A report a reviewer can trace, not a number on a page.

Results are documented under the laboratory’s written quality system, which controls how testing is performed, documented, and reviewed. Formal accreditation covers the published scope. Reports are prepared for use by a qualified engineer for the intended application, and structured so a reviewer or building official can trace each reported value to the specimen and setup that produced it.

The goal is that a test run today and a test run next year, by a different operator, follow the same procedure and mean the same thing. Written procedures and controlled setups reduce operator-to-operator and lab-to-lab variability and make rigorous testing available to more manufacturers.

What a test report contains

Cyclic connection test report · contents

What a report contains depends on the test. This is the cyclic beam-to-column connection test.

  1. 01Scope and governing standard (edition pinned)
  2. 02Specimen description and provenance
  3. 03Setup and instrumentation record
  4. 04Loading protocol per the standard
  5. 05Measured response: loops, backbone, Kconn
  6. 06Observed behavior and failure sequence
  7. 07Interpretation against the assumption tested

Common questions

What does a stub column test prove?

Answer

It measures the compressive capacity of a short column section — capturing the combined effect of perforations, thin walls, and cold work that hand calculations approximate with an efficiency factor. The industry assumed 0.90–0.95 for years. SMHE’s testing produced lower values, and independent research reported Q ≈ 0.64 for a 3×3×14Ga section, roughly a third lower, with direct seismic consequences.

Why does beam-to-column connection stiffness matter?

Answer

Rack connections are neither rigid nor pinned, and the assumed extreme changes drift, load path, and failure-mode predictions. Cyclic testing produces the measured stiffness (Kconn) and backbone curve that put the frame model on evidence instead of assumption.

Do lab tests replicate real-world conditions?

Answer

Not exactly. They apply controlled loading to the reference the governing standard defines, so the result is comparable, repeatable, and defensible. The aim is to measure whether the assumptions behind the design remain valid in the finished product.

Can you test to our own protocol or a project-specific requirement?

Answer

Yes. Testing is performed to applicable standards, customer-defined procedures, and project-specific protocols, under the laboratory’s written quality system. Ask us to confirm whether a given test falls within the accredited scope of certificate TL-732. View the published scope.

Which number in your model is an assumption?

Kconn, Q, base fixity, deck capacity, material ductility — if it was inherited rather than measured, testing can put it on evidence.

To scope a program, include

  • Product or component drawings
  • The design value in question
  • Governing standard or protocol, if known
  • Configurations and specimen count
  • The decision the result supports
  • Required timing
Request testing